1 · Equipment Overview

FunctionMechanical fibrisation of fibre at high consistency.
FillingsBalanced rotor + non-balanced stator fillings, fixed on seats.
BearingsCylindrical-roller radial + thrust bearing.
Seal water≈ 3–6 L/min depending on seal type.

2 · Maintenance Process

PreparationRetract rotor; open bottom valve; shut water / steam; disconnect and flush seal hoses.
Remove seatsKeep two bolts, fit lifting tool; lift rotor / stator seats together to service position.
Filling renewalFit new fillings on seats; clean refining-zone faces with non-abrasive tools.
Remove rotorMark radial position (off seating zone); pump oil until it shows at shaft end; monitor pull-off with dial gauge.
Mechanical sealReplace seal; note orientation (drain port down); plug removal — beware antifreeze splash.
Bearing unitLift out cartridge unit; liquid gasket on joint (one bead each side, not excessive); torque to spec.
Rotor refitOil taper; drive-up mount; keep shaft level — never sling from the seal area.
AlignmentDial-indicate rotor–stator; adjust wedge blocks and spring preload; re-check after several working travels.
Flush & ventHot-oil flush bearings (no cooling water); vent seal-water circuit (loosen joints until air-free); verify flow.
Trial runJog → ramp up; bearing vibration spectrum; re-check alignment; refit seats. Note: never move the shaft axially while stationary — if unavoidable, bar the rotor manually with the lube station running.

3 · Key Process Photos

Refiner on the floor
Refiner on the floor
Refiner line in workshop
Refiner line in workshop
Body and guarding
Body and guarding
Machine body exterior
Machine body exterior
Tapered-roller bearing set
Tapered-roller bearing set
Large disc at service position
Large disc at service position
Disc surface close-up
Disc surface close-up
Rotor shaft and support
Rotor shaft and support

4 · Acceptance & Handover

Fillings seated on clean faces; rotor–stator alignment within tolerance and re-checked after wedge preload; mechanical seal correctly oriented, vented and leak-free; bearing unit gasket-sealed and hot-oil flush passed; trial vibration spectrum and re-alignment normal.