FunctionPM wet-end ventilation and dryer air supply / heat recovery
Key partsHoods / fans / heat exchangers / dampers
FocusAir leakage, fouling, flow balance
Shutdown & handoverLock out; isolate heating and compressed air.
System surveyMeasure airflow/pressure, temperature & humidity; locate and record leakage.
Hood strip-downOpen hoods / nozzle boxes; remove dust and scale inside.
Exchanger cleaningHigh-pressure / steam cleaning of fins and tube bundles.
Corrosion checkUT thickness on wet-side tube bundles; replace corroded tubes.
Leakage repairReplace duct flange seals; weld-repair leaks.
Fan serviceClean impellers and re-balance; replace bearings and re-lubricate.
Dampers & filtersVerify damper travel; replace filter cartridges.
ReassemblyRefit hood seals; balance branch airflows.
Trial runStart fans and heat up; verify temperature/humidity and heat-recovery efficiency.
Airflow / pressure restored to design values after hood and exchanger cleaning; leakage rate within limit after repairs; corroded tubes pass thickness check; dampers fully operative with balanced branch flows; fan vibration and bearing temperature normal; heat-recovery efficiency to target. Delivered with commissioning and measurement records.