Home / Technical Library / Paper Machine Equipment

Press & Dryer Sections Overhaul

Press rolls and shoe units, dryer cylinders, steam & condensate systems — surfaces, doctors, seals and bearings.

FunctionPress dewatering and cylinder drying
Key partsPress rolls / shoe plates / dryers / steam & condensate
FocusRoll surfaces, doctors, steam seals, bearings

1 · Equipment Overview

Press sectionMechanical dewatering by press / shoe rolls.
Dryer sectionMulti-cylinder staged evaporation.
Steam & condensateSteam-heated cylinders with condensate recovery.
FabricsPress felts / dryer fabrics support and transfer the sheet.
Key componentsSuction rolls, doctors, rotary joints.

2 · Maintenance Process

Shutdown & handoverIsolate steam, depressurize, drain condensate; record nip loads and temperatures.
DisassemblyRemove doctors and rotary joints; lift out rolls and shoe units.
CleaningClean roll and cylinder surfaces and steam lines; remove stock and scale.
NDTUT/PT on dryer heads and shaft ends; surface crack detection on rolls.
MetrologyRoll roundness / crown, cylinder grooving, bearing clearances, nip footprint.
Surface repairGrind press-roll / cylinder surfaces; re-cover where necessary.
Shoe serviceReplace shoe sleeves; renew hydraulic seals; calibrate oil film.
Steam & condensateRenew rotary-joint seals; verify siphons and steam traps.
Doctor refitFit new blades; set holder pressure and angle.
Heat-up trialSteam up; verify each cylinder temperature and nip dewatering.

3 · Key Process Photos

Large dryer cylinder polished in workshop
Large dryer cylinder polished in workshop
Grooved cylinder surface detail
Grooved cylinder surface detail
Roll assembly in transport crate
Roll assembly in transport crate
Hydraulic test and metrology bench
Hydraulic test and metrology bench
Cylinder head and drive end
Cylinder head and drive end
Alignment measurement in workshop
Alignment measurement in workshop

4 · Acceptance & Handover

Roll / cylinder roundness and crown to drawing after grinding; rotary joints and traps pressure-tested leak-free; uniform cylinder temperatures after steam-up; nip footprint uniform with stable dewatering; consistent doctor loading. Delivered with NDT, metrology and pressure-test records.

Request a quote for this scope   ← Back to library