Lock outStop, cool down, isolate steam.
Duct cleaningClean tower and ducts; clear screen perforations.
CoilsLeak-test, de-scale and pressure-test steam coils.
FansInspect and clean fan blades; correct balancing.
Wire beltAdjust belt tension and tracking.
Sheet transferCheck and adjust wire transfer / tail threading.
CutterReplace cutter blades; set cut length.
Heat recoveryInspect recovery section; repair air leaks.
Trial runRun air system; balance flow and temperature.
VerificationRe-verify sheet moisture and drying uniformity.
Steam coils leak-free and pressure-test passed; fans run smooth without abnormal vibration; wire belt tracked and tensioned; cut length accurate; sheet moisture on target with uniform drying.